Public Content Library

Efficiency and Corrosion Benefits of Pre-insulated PEX Piping in Campus Systems 

10-04-2017 10:46

Summary

This presentation will include the design and installation process of pre-insulated PEX piping system that reduces service and operating costs while increasing the serviceable life of the three listed campus projects: Colorado School of Mines’ Weaver Towers, Fort Lewis College, and Miramar College Administration Building

Speaker

Kevin Hale, REHAU


#2015
#CampusEnergyConference
#ConferenceProceeding
#Operations
#REHAU
#MasterPlanningandSystemDesign
#UnitedStates
#NorthAmerica

Statistics
0 Favorited
4 Views
1 Files
0 Shares
77 Downloads
Attachment(s)
pdf file
Efficiency and Corrosion Benefits of Pre-insulated PEX Pi...   2.90 MB   1 version
Uploaded - 10-04-2017
Kevin Hale, REHAU