Public Content Library

New Back-Up Generation for Critical Facilities at the University of Iowa 

09-14-2017 16:15

Summary

This case study will discuss a new back-up generation facility at the University of Iowa, designed to automatically black start the Main Plant and provide back-up power to critical facilities throughout campus. The plant is tied into the campus grid. It is in an addition, in a very visible part of campus. Aesthetics and noise considerations were incorporated into the design. This plant replaces building diesel engine generators for back-up power.

Speakers

Ben Anderson, University of Iowa
Jim Nonnenmann, PRVN Consultants
Kevin Voss, PRVN Consultants



#ConferenceProceeding #CampusEnergyConference #UnitedStates #PRVNConsultants #Microgrids #NorthAmerica #UniversityofIowa #Iowa #2015

Statistics
0 Favorited
2 Views
1 Files
0 Shares
24 Downloads
Attachment(s)
pdf file
New Back-Up Generation For Critical Facilities at the Uni...   6.93 MB   1 version
Uploaded - 09-14-2017
Ben Anderson, University of Iowa Jim Nonnenmann, PRVN Consultants Kevin Voss, PRVN Consultants