Variable power demand presents a huge challenge for campuses looking to meet consumption needs while maximizing energy efficiency. This case discusses a 3 step solution Radix implemented for UMass-Amherst, focused on an Operational Assessment, Energy Audit, and finally, a scenario-based Advisory System that provides ongoing control and visibility over energy usage and makes real-time recommendations to keep the physical plant running at maximum possible efficiency. Expected results are 3%/$1,000,000 annual reduction in operating costs.
Thiago Bacic, Business Development Manager, Radix Engineering
#DistrictEnergyandCHPCaseStudies