This presentation will look at how completing a holistic, production-to-demand-level plan can provide a foundation for system optimization and resiliency. We look at how detailed planning can reduce up-front costs and maximize productivity of existing assets through granular analysis. We’ll review how past initiatives, trends, and major events have significantly changed direction of utility infrastructure in the past 15 years, and planning for different variables through rapid scenario analysis can provide a system positioned for future unknowns.
Ben Dombrowski,Project Manager / Mechanical Engineer,Jacobs
Max Littlefield,Mechanical Designer,Jacobs