The North Campus Utility Infrastructure project is a multiphase project for the installation of heating water and chilled water distribution in a way that minimizes campus disruption on this sensitive part of campus and develops a regional heating water plant to replace the low pressure steam system. The first two phases of the project included the installation of the direct buried systems. The final phase of the project includes the development of the regional plant. This plant allows heating water to be distributed to all connected buildings and is sized for future expansion. The systems provide robust infrastructure for the future of the historic part of campus and enable a transition to using lower carbon energy sources in the future.
Vance Nall, Thermal Utility Engineer, RMF Engineering
Jason Perry,Division Manager, University of Georgia
#System Expansion, Modernization and Renewal
1800 West Park Drive, Suite 350
Westborough, MA 01581
Phone + (508) 366-9339
Fax + (508) 366-0019
© 2017 International District Energy Association, All Rights Reserved. Site by eConverse Media