CHA is teamed with Cogen Power Technologies and Bette and Cring Construction providing a 2.65MW natural gas fired engine generator that will provide hot water, steam and chilled water to supplement the power, heating and cooling loads to the UMass Memorial Medical Center located in Worcester, MA. The plant is designed to import and export power, and under most conditions, provide all of the hospital’s electric needs.
Session Track 5A
Aaron Bolhous, CHA Consulting
1800 West Park Drive, Suite 350
Westborough, MA 01581
Phone + (508) 366-9339
Fax + (508) 366-0019
© 2017 International District Energy Association, All Rights Reserved. Site by eConverse Media