This presentation will include the design and installation process of pre-insulated PEX piping system that reduces service and operating costs while increasing the serviceable life of the three listed campus projects: Colorado School of Mines’ Weaver Towers, Fort Lewis College, and Miramar College Administration Building
Kevin Hale, REHAU
1800 West Park Drive, Suite 350
Westborough, MA 01581
Phone + (508) 366-9339
Fax + (508) 366-0019
© 2017 International District Energy Association, All Rights Reserved. Site by eConverse Media