Power Plays - Steam Turbine and Reciprocating Generator Upgrades at Texas A&M University 

09-06-2023 11:20

Session Abstract

To maximize electrical production capacity and operational resiliency (including enhanced zero voltage start capabilities), Texas A&M University is pursuing integrated design-build delivery for their replacement 10MW steam turbine generator and 4MW reciprocating generator. This upgrade requires careful coordination with an operating utility system inside a historic structure as well as modifications to 1950's era steam turbine ancillary systems such as pumps, electrical gear, cooling towers, and surface condenser equipment.

Presenters

Justin Grissom, Department Manager, OnSite Energy & Power, Burns & McDonnell


#DistrictEnergyandCHPCaseStudies


#ConferenceProceeding
#Presentation
#Poster

Statistics
0 Favorited
7 Views
2 Files
0 Shares
6 Downloads

Tags and Keywords

Attachment(s)
pdf file
Power Plays - Steam Turbine and Reciprocating Generator U...   1.77 MB   1 version
Uploaded - 09-06-2023
Presented at IDEA 2022 in Toronto Ontario Canada
pptx file
Power Plays - Steam Turbine and Reciprocating Generator U...   16.82 MB   1 version
Uploaded - 09-06-2023
Presented at IDEA 2022 in Toronto Ontario Canada