Session Abstract

This presentation will discuss the addition of two new steam turbine generators (15MW) within the Main Power Plant at the University of Iowa. The two steam turbine generators included TG7, a 5 MW back-pressure unit, and TG8, a 10 MW tandem unit with a back-pressure side and condensing side. TG8 is unique and set up to operate in its most efficient mode, back-pressure during normal operation, and can operate in condensing mode for emergency backup power, utility curtailment, and during an electrical storm.

Presenters

P. Russell Price,President,PRVN Consultants, INC.

Matt Mercer,Power Plant Manager,University of Iowa/ENGIE North America


#DistrictEnergyandCHPCaseStudies
#ConferenceProceeding
#Presentation
#CampusEnergy2022

Statistics
0 Favorited
1 Views
1 Files
0 Shares
0 Downloads

Tags and Keywords

Attachment(s)
pdf file
Power Plant - Capacity Expansion   4.11 MB   1 version
Uploaded - 09-19-2023
Presented at Campus 2022 in Boston, MA