Hosted By:
Skip to main content (Press Enter).
Sign in
Skip auxiliary navigation (Press Enter).
Contact Us
Join
Skip main navigation (Press Enter).
Toggle navigation
What to Expect
Schedule
Conference Overview
Conference Program
Plenary Panels
Microgrid Workshop
District Energy Workshop
Technical Tours
Golf Tournament
Spouse/Guest Tour
Registration
Hotel & Travel
Conference Venue
Hotel Information
Travel & Transportation
General Information
Sponsors
Sponsorship Information
Sponsors to Date
Trade Show
Exhibitor Information
Business Partners to Date
Forums
Forum Home
Library
View Entry
Public Content Library
Speed to Market: Fast Track Project Implementation
Recommend
10-13-2017 11:45
Blake Ellis
Summary
Why the Need for Speed?
How Do I Go Fast?
Design
Bid
Build with Early Procurement
Construction Manager (CM at Risk or CM Agent)
Design – Build
What is Different? / How Do I Do It?
Compare and contrast the methods
Case Studies
Purdue University Chiller Replacement
Enwave – Biomedical District Steam Plant
Airbus – Powerhouse
Questions & Answers
Speakers
Blake Ellis, Burns & McDonnell
#AnnualConference
#ConferenceProceeding
#2014
#ConstructionandCommissioning
#BurnsandMcDonnell
#Enwave
#PurdueUniversity
#Airbus
Statistics
0 Favorited
3 Views
1 Files
0 Shares
23 Downloads
Tags and Keywords
Attachment(s)
4A.3_Ellis.pdf
1.40 MB
1 version
Uploaded - 10-13-2017
Download
Download Document
Please accept the terms of the copyright associated with this attachment before downloading it. Click the link below to read the terms.
Accept
Register Now
© 2017 International District Energy Association, All Rights Reserved. Site by
eConverse Media
1800 West Park Drive, Suite 350
Westborough, MA, USA 01581
Phone: +1 508-366-9339
Copyright © 2019 International District Energy Association. All rights reserved.
Powered by Higher Logic