This presentation explains implementing control system solutions which assist in solving grid limitations by allowing development independent of the macro-grid. We are solving macro-grid infrastructure problems by meeting energy needs of a 505-room hotel/conference center, without an electric utility connection. Using CHP, generators, and energy storage allows the expansion and renovation of this facility, which would have otherwise been rendered infeasible due to limitations of on-site utilities, all while improving facility energy resiliency.
Session Track 4B
Serge Zinger, Thermo Systems
Cedric Chan, Waldron Engineering
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media