UVa and HGA presented to the 2015 IDEA Campus Energy Conference highlighting innovative design changes under construction for the North Grounds Mechanical Plant including: combining an open Cooling Tower system with a closed loop heating HW system on heat recovery chillers, transitioning a MTHW system operating at 240 degrees F to a LTHW and abandoning the Heat Recovery Chiller packaged control systems in favor of a, customized approach.
Justin Callihan, University of Virginia
Joe Witchger, HGA Architects & Engineers
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media