Valve, vents & drains installation, best practice; what Germany has learned over 100 years of operating a district energy system. Where are the weak areas. Smart valve choices for long term cost savings. Cologne’s experience of a valve vent failure and how the design was changed for safe operation.
Knud Strauchmann, Boehmer GmbH
Caroline Heon-Roberts, Boehmer GmbH