Presentation will focus on two or three recent and current Canadian CHP projects in the 5 to 15 MW range and review the specific cold weather power island design and balance of plant considerations for industrial power projects.
Matt Lensink, CEM EngineeringJohnathan Coleman, Solar Turbines Canada Limited
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media