Public Content Library

District Cooling Plant Optimization 

06-21-2018 12:17

Summary

Gardens -03 DCP is designed and built for 15,000 TR. Chillers had dedicated primary pumps for flow rate equivalent to 12.8°F; existing plant operational delta T is 9.3°F. Empower replaced existing constant speed primary pumps with variable flow Primary pumps corresponding to the actual Delta T. Pumps were selected for 2.4GPM/TR, replacing 1.875 GPM/TR pumps. The key aspects of up gradation are effective utilization of plant capacity, mitigating Low Delta T syndrome and other financial benefits. 

Session Track 1D

Speakers

Tariq Al Yasi, Empower Energy Solutions


#ConferenceProceeding
#2018
#AnnualConference
#DistrictCooling
#Empower

Statistics
0 Favorited
16 Views
1 Files
0 Shares
7 Downloads
Attachment(s)
pdf file
1D.1_AlYasi.pdf   1.21 MB   1 version
Uploaded - 07-02-2018