Electrical Master Planning, Substation, Distribution & Building Service Entrance Upgrades 

02-20-2020 10:58

Summary

Campus Electrical Master Planning Process – Overall process of condition assessment and design concepts to improve electrical reliability, redundancy and safety, while minimizing campus disruption during construction.

  • Substation Upgrades – Complete replacement of incoming utility switch, main transformer and main substation switchgear.
  • Medium Voltage Distribution Upgrades – Replacement of MV cabling, switches and ductbanks.
  • Building Service entrance Upgrades – Replacement of MV transformers and LV switchgear.

Track 5C: Electrical Distribution & Micorgrid Resiliency

Speakers

Nikolai Terpak, CHA Consulting Inc


#ConferenceProceeding
#CampusEnergyConference
#2020
#Microgrids
#MasterPlanningandSystemDesign
#Resiliency
#CHAConsultingInc

Statistics
0 Favorited
15 Views
1 Files
0 Shares
7 Downloads
Attachment(s)
pdf file
5C.1_Terpak.pdf   3.51 MB   1 version
Uploaded - 02-20-2020