Public Content Library

Equipment Upgrades in a Space-Constrained Plant: University of Rochester Boiler Installation 

06-14-2017 15:43

Summary

The University of Rochester is replacing an existing boiler with a new unit in their space-constrained plant. Several challenges were overcome to fit this new unit. This presentation will explore identification of these space challenges and methods for addressing these challenges. Owner and technical perspectives will be explored. Planning approaches will be discussed including 3D scanning and identification of the move-in path.

Speakers

Shane Taylor, Sega Inc.

Richard Gardner, University of Rochester



#2017 #NorthAmerica #CampusEnergyConference #SegaInc #CampusEnergy #UniversityofRochester #ConferenceProceeding #NewYork #CHP

Statistics
0 Favorited
5 Views
1 Files
0 Shares
36 Downloads
Attachment(s)
pdf file
University of Rochester Boiler Installation   3.14 MB   1 version
Uploaded - 06-14-2017
Shane Taylor, Sega Inc. Richard Gardner, University of Rochester