The University of Virginia has recently completed a project that installed a 100MMbtu/hr hot water generator. This project supports the LTHW conversion currently in progress and represents the first phase of the Main Heat Plant transition from steam to hot water. Additional heating capacity was needed to support University growth and the decision to install a hot water generator versus steam boiler was based on lower LCC and reduced GHG emissions.
Steve Seckler, Greenland Enterprises
Brett Landrum, Victory Energy
Chris Farr, Jacobs
Paul Zmick, University of Virginia
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019