This unique project was for renewal of gas-engine driven chillers and ancillary equipment at the UConn Central Utility Plant. Included was modifications to the chilled water pumping, piping and controls between the CUP and Cogen chiller plants. The extent of modifications made for challenging logistics.
John Turner, BOND
Alan Vanags, BVH Integrated Services
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media