This unique project was for renewal of gas-engine driven chillers and ancillary equipment at the UConn Central Utility Plant. Included was modifications to the chilled water pumping, piping and controls between the CUP and Cogen chiller plants. The extent of modifications made for challenging logistics.
John Turner, BOND
Alan Vanags, BVH Integrated Services