New and or renovated buildings are consistently being added to district energy plants. The new hydronic piping connecting the building to the utility must be cleaned and flushed properly to protect the plant investment. This presentation will demonstrate case studies using self contained flush units along with the best practices discovered from field implementations. This presentation shares thoughts behind this innovative approach with the pros and cons.
Russell Buras, PurgeRite
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media