Public Content Library

Princeton University Substation Upgrade Project 

03-01-2019 12:19

Summary

Princeton University has reached the allowable capacity on the 26kV utility interconnection with PSE&G. A new 69kV high-voltage substation is being constructed to connect the existing 26kV substations to the PSE&G transmission system. The project challenges include a directional bore underneath a lake, miles of underground distribution cable, replacing critical equipment, and phasing the cut-overs. This project will provide greater capacity, and increase in redundancy, and increase reliability for the Princeton electrical distribution system.

Session 4B: Planning & Upgrades of Electrical System & Controls

Speakers

John Lacenere, Princeton University
Brad Shuffield, Burns & McDonnell


#SystemUpgrade
#2019
#ConferenceProceeding
#CampusEnergyConference
#Princeton
#BurnsandMcDonnell

Statistics
0 Favorited
8 Views
1 Files
0 Shares
4 Downloads
Attachment(s)
pdf file
4B.1_Shuffield_Lacenere.pdf   1.62 MB   1 version
Uploaded - 03-01-2019