The Milwaukee Regional Medical Center needed to overhaul its infrastructure as it took on its own energy production and distribution in 2017. This work included distribution network redundancy for steam and chilled water by adding miles of interconnecting loop piping. The addition of new chillers and cooling towers; redundant production facilities for each service. The replacement of equipment allowed for electric and thermal savings, as well as creating more reliable systems.
Session Track 3A
Rory Peters, Ever-Green Energy
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media