This presentation will include an overview of the 2 million gallon chilled water TES tank project at Mt. San Antonio College in Walnut, California. This is a unique TES application because the chilled water tank is fully buried under the student parking lot. The presentation will include perspectives of the project from the viewpoint of the Engineer, and Tank Builder. Also, a case study with actual data of the TES tank performance.Session Track 4C
Guy Frankenfield, DN TanksJames Valiensi, P2S Engineering