A contract to design, build and operate a central energy network for St Andrew's Park, which is being built on the old RAF Uxbridge site, has been awarded to Metropolitan and its partner Vital Energi.
The new estate will have more than 656 homes, a hotel, care home, theatre and offices. The contract is to supply low-carbon heat to all buildings on the site.
The Mayor of London wants district energy networks to generate 25% of the heat and power used in the capital by 2025.
Continue Reading
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media