The Town of New Canaan - REQUEST FOR PROPOSAL (RFP) WASTEWATER TREATMENT PLANT CHP SYSTEM

By District Energy posted 03-09-2020 19:37

  

Summary

The Town of New Canaan is soliciting proposals for the implementation and maintenance of a natural-gas fired
combined heat and power (CHP) system(s) to be installed to provide baseload electricity and heat for the
Wastewater Treatment Plant and ancillary buildings located at 394 Main Street, New Canaan, CT 06840.
Proposals are sought from qualified engineering, procurement and construction (EPC) contractors to install and
maintain the equipment on a turnkey, design-build basis.

Note: there is a natural gas expansion plan currently underway in the Town of New Canaan and it is expected that
the gas line will be extended to the Wastewater Treatment Plant and the Department of Public Works (DPW)
campus, subject to the anticipated implementation of a CHP system. The location of gas service will be informed
by the optimal location of the CHP equipment.

The Town of New Canaan reserves the right to reject any and all proposals, or separate parts thereof, requested
herein. The Town of New Canaan is exempt from the payment of Federal Excise Taxes, Connecticut Sales and
Use Tax according to State Statute. Such taxes must not be included in bid prices nor added to any items
specified.