Blog Viewer

West County Wastewater Moves Forward with Backup Power Plan as part of Ongoing, Major Energy Facility Project with ENGIE

By District Energy posted 05-01-2023 09:41

  

GlobeNewswire

Summary

West County Wastewater’s (WCW) Board of Directors today announced the approval of Phase Two of their comprehensive energy improvement project. Phase Two initiates the addition of backup power to major energy facilities at WCW’s Water Quality and Resource Recovery Plant. ENGIE North America (ENGIE), a leader in the Net Zero energy transition, will be installing a battery energy storage system that will work in coordination with the cogeneration system, solar system and diesel generators.

The new microgrid will provide uninterrupted plant operations during weather or utility related outages, now commonplace in California. In 2022 alone, California led the United States with nearly one quarter of outages due to increasing temperatures, droughts, wildfires and a strained power grid. Working with ENGIE, the additions to major facilities are a part of WCW’s 5-year strategic plan. The infrastructure project will reduce greenhouse gas emissions by 93 percent and save more than $83 million over its lifetime.  

ENGIE and West County Wastewater are collaborating on what will be a best-practice water-energy nexus technology model for sustainable water treatment. Along with the new microgrid, the project includes construction of a solar system, upgrades to LED lighting, electric vehicle charging stations, and various wastewater treatment process improvements to generate electricity and produce Class A biosolids.

Continue Reading


#MemberNewsIDEA
#News
#ENGIE
#CHP
#Microgrids
#Content
0 comments
6 views

Permalink