The Mayor EU
Summary
The Berlin Senate has decided on a roadmap to start replacing fossil fuels with geothermal energy as part of the plan to achieve climate neutrality in the city before 2045. For this purpose, the local government has already defined and technically examined 13 potential locations that could serve as sources of geothermal heat.
Of these, three locations have been determined as suitable for test drilling. The deep drilling will likely take place in 2025 after selecting the enterprises to be responsible for the three projects.
Two of the locations, which will be explored, are the Neukölln district heating plant, and the Berlin-Buch campus. Two spots – the residential Schumacher Quarter and the Urban Tech Republic, located at the
Continue Reading
#News#DistrictHeating