Blog Viewer

BMW Group Plant Steyr Switches Energy Supply Ahead of Schedule

By District Energy posted 10-02-2024 17:29

  

Bimmer Life

Summary

BMW Group Plant Steyr is switching entirely to district heating for warmth: in regular operations the Austrian engine facility no longer uses natural gas, relying instead on heat from a nearby biomass powerplant.

The switch would not have been possible without a strong partner in the region: BMW Group Plant Steyr now sources its heat from the biomass powerplant of Fernwärme Steyr, just under a kilometre away. This is operated by the state’s two energy providers – Energie AG Oberösterreich Erzeugung GmbH and EVN Wärme GmbH – in their joint subsidiary, Bioenergie Steyr GmbH. To provide the heat energy that Plant Steyr needs, an additional heat generation plant with a 10-megawatt biomass boiler is being erected at the site. So, Plant Steyr will source its heat from renewable resources: wood chips from the surrounding forests.

Continue Reading


#News
#DistrictHeating
0 comments
2 views

Permalink