Blog Viewer

Regional district looks at HVAC replacement options for Prince George building

By District Energy posted 03-25-2025 13:04

  

Prince George Citizen

Summary

The Regional District of Fraser-Fort George is investigating the possibility of hooking its building at 155 George St. up to the City of Prince George’s district energy system, among other options

The board of directors passed a motion directing staff to prepare Class B estimates for a standalone replacement of the building’s air handling unit, connecting the HVAC system to the Downtown Renewable Energy System and electrifying the system at its Thursday, March 21 meeting.

Continue Reading


#News
#DistrictEnergy
0 comments
1 view

Permalink