Blog Viewer

Turek, Poland progresses geothermal heating project with test of second drilled well

By District Energy posted 05-21-2025 12:44

  

Think GeoEnergy

Summary

The city of Turek in central Poland continues to make good progress on a planned geothermal heating project with the testing of the second drilled well GT-2. The geothermal heating plant in Turek aims to start commercial operations by 2026.

Well GT-2, drilled by  UOS Drilling SA, reached a depth of about 2665 meters. Designated as a reinjection well, the well has three times more injectivity (~150 cubic meters per hour) than the first well and taps into a resource with temperature of up to 79.4 °C. Together with well GT-1, drilled back in 2019, the doublet provides the basis for the geothermal heating project.

Continue Reading


#News
#GeothermalandGeo-Exchange
#DistrictHeating
0 comments
2 views

Permalink