Think GeoEnergy
Summary
Geothermal power generation stands to benefit from a recent Executive Order released by the Trump Administration to accelerate federal permitting for data center infrastructure in the United States. The goal of the EO is to ease federal regulatory burdens for AI data centers and supporting infrastructure, including power generation and transmission facilities.
In more specific terms, “geothermal power equipment” is included in the EO’s “Covered Components” or the materials, products, and infrastructure that are required to build data center projects. Moreover, this means that geothermal power projects or facilities for manufacturing of geothermal power equipment can be considered “Covered Component Projects” under the EO.
Continue Reading
#News#GeothermalandGeo-Exchange#DataCenter