Bioenergy Times
Summary
The municipal utility of Leszno (MPEC) in central Poland will invest PLN 122 million (USD 33 million/EUR 28.6 million) to construct a biomass-fired cogeneration (CHP) plant with a capacity of 3.41 MWe and 10.8 MWt, reports Renewables Now.
The plant will be integrated with the existing Zatorze heating plant and connected to the city’s district heating and power systems.
Continue Reading
#News#CHP#Biomass#DistrictHeating