Canadian Consulting Engineer
Summary
Introba recently celebrated the official public opening of Kelowna International Airport’s (YLW’s) terminal expansion, which the firm says sets “a new benchmark for sustainable, future-ready airport infrastructure.”
YLW has committed to achieving carbon-neutral building operations by 2023 and net-zero airport operations by 2040. The project integrates geo-exchange and thermal recovery heat pumps for low-carbon heating and uses mass-timber construction to reduce embodied carbon.
Continue Reading
#News#GeothermalandGeo-Exchange#HeatPumps