Public Content Library

Field Erected Large Industrial Hot Water Generator Installation at the University of Virginia 

02-20-2020 12:57

Summary

The University of Virginia has recently completed a project that installed a 100MMbtu/hr hot water generator. This project supports the LTHW conversion currently in progress and represents the first phase of the Main Heat Plant transition from steam to hot water. Additional heating capacity was needed to support University growth and the decision to install a hot water generator versus steam boiler was based on lower LCC and reduced GHG emissions.

Track 6D: Steam to Hot Water Conversion

Speakers

Steve Seckler, Greenland Enterprises

Brett Landrum, Victory Energy

Chris Farr, Jacobs

Paul Zmick, University of Virginia


#CampusEnergyConference
#ConferenceProceeding
#2020
#Optimization
#JacobsEngineering

Statistics
0 Favorited
6 Views
1 Files
0 Shares
8 Downloads
Attachment(s)
pdf file
6D.3_Zmick_Farr_Landrum_Seckler.pdf   4.90 MB   1 version
Uploaded - 02-20-2020