Public Content Library

1577 Entries
 
 
8 months ago
Be the first person to recommend this.

Summary

Durham College’s Simcoe Geothermal Project, featuring a borehole field comprised of 150 wells for an Underground Thermal Energy Storage (UTES) system, was developed to achieve ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

As part of a larger commissioning effort at CU Boulder’s East Plant and West Plant, AEI helped identify discrepancies between the control system installation, design drawings, ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

Over half of the energy consumed in the United States is rejected as waste heat. There exists a tremendous opportunity to capture and use that waste heat to reduce overall ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

A sophisticated analysis and review of precise HVAC control methodology to achieve exceptional control and energy efficiency for critical areas such as operating rooms, laboratories ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

When most institutions think about the broad topic of renewable campus energy, geo-exchange technologies are not the first that come to mind. The focus has been on solar ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

For many facilities, control room and human machine interface design are not performed in a coordinated and integrated manner. This approach often leads to sub-optimal results ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

The University of Minnesota increased resiliency on their campus by migrating legacy control systems for their Southeast Heating Plant while integrating SCADA controls into ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

Technical, economic, environmental and resiliency merits of CHP systems for power and heat. Presentation will address some of the suggested conference themes including how ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

Waterside scale deposits in steam boilers can have a dramatic impact on fuel efficiency, boiler structural integrity, and maintenance costs for the steam plant operation. ...

Attachments
8 months ago
Be the first person to recommend this.

Summary

St. Joseph’s Hospital Health Center planned a $200 million-dollar expansion that was projected to “max out” the capacity of the existing infrastructure, forcing the hospital ...

Attachments