Breaking the Limits - Faster Installations of District Energy Hot Water Piping Under Difficult Conditions 

02-25-2019 18:45

Summary

This presentation features case studies illustrating time and cost savings achieved by installing flexible, pre-insulated metal pipe with directional drilling instead of conventional steel pipe under very difficult and complex conditions—including inner city existing underground infrastructure, railroad crossings, rivers and busy roads. Explained in detail are the installation process, and the requirements for users, planners and installers.