This $240M project upgraded the Central Utility Plant and replaced the entire utility distribution network for the entire campus. The energy distribution systems were upgraded in quality and size to deliver the energy demands of the existing and future planned buildings. Systems include MTHW, CHW, power and other utilities with significant hardscape and landscaping upgrades. Replacing the entire utility distributions systems on an operating campus requires significant design and planning efforts to ensure continuous operations.