Discussion of our looped feeder design concept using automated fault detection and loop feeder isolation and restoration.Review implementation of design concept throughout the construction process which is now complete. Discuss challenges of incorporating an existing 4kV diesel generator into the system rather than the installation of new 12kV generators for support of the entire system (a change made due to cost constraints).Discuss the use of pad mounted SF6 insulated switchgear as opposed to traditional metal-clad switchgear at the utility interface.
Steve Bowman, Wiley Wilson
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019