This case study reviews EMU’s recent Heating Plant upgrade involving replacement of their Solar Taurus 60 combustion turbine and corresponding heat recovery steam generator (HRSG) with a larger combustion turbine (Solar Taurus 70) and HRSG. The larger arrangement allows for complete campus power and steam requirements. The project was executed under a EPC contract with Engie which included guaranteed savings terms. Commonwealth as the OE provided design review, construction oversite and commissioning oversite.
Jack McCormick, Commonwealth Associates
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019