This presentation will include the design and installation process of pre-insulated PEX piping system that reduces service and operating costs while increasing the serviceable life of the three listed campus projects: Colorado School of Mines’ Weaver Towers, Fort Lewis College, and Miramar College Administration Building
Kevin Hale, REHAU