A discussion on how the Merck West Point site is utilizing a variety of strategies to optimize the central chilled water system while reducing building demand. Approaches included chiller plant optimization, real time hydraulic distribution monitoring, active building monitoring, master planning, and education.
Michael Nyhan, Merck
Travis Smith, Smith Engineering
Dan Shirley, Thermo Systems
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media