A discussion on how the Merck West Point site is utilizing a variety of strategies to optimize the central chilled water system while reducing building demand. Approaches included chiller plant optimization, real time hydraulic distribution monitoring, active building monitoring, master planning, and education.
Michael Nyhan, Merck
Travis Smith, Smith Engineering
Dan Shirley, Thermo Systems