Only 1 shutdown allowed 

09-19-2023 12:47

Session Abstract

Voted as ENR New England's 2020 Best Projects,  On a 16-month project to improve an existing five-story central heating plant on the Boston College campus, with only one allotted shutdown allowed, the team committed nearly two years to preconstruction and extensive planning. To meet the college’s needs, the construction team built a new 9,000-sq-ft addition that connects to the existing live plant and houses two new boilers. Construction of the steel-framed addition required deep excavation work and support. Water and sewer lines had to be routed around the footprint.  This presentation will cover lessons learned during preconstruction and the shutdown planning while ensuring that college is operating business as usual

Presenters

Kailash Viswanathan,Director of Energy,Consigli Construction Co., Inc.

Dan Diorio,Engineering Construction Manager,Boston College


#DistrictEnergyandCHPCaseStudies
#ConferenceProceeding
#Presentation
#CampusEnergy2022

Statistics
0 Favorited
1 Views
1 Files
0 Shares
0 Downloads
Attachment(s)
pdf file
Only 1 shutdown allowed   3.93 MB   1 version
Uploaded - 09-19-2023
Presented at Campus 2022 in Boston, MA