As we near “Post-COVID”, updating master plans is critical. TECO serves the Houston Medical District (20+ million sq ft) with industry leading reliability/resiliency while providing cost effective thermal utilities. TECO added CHP and thermal storage as part of the last master plan implementation and provides highly efficient utilities. With recent optimization, efficiency continues to improve. This new master plan includes consideration of CHP#2 and TES#2, water resiliency/hardening, and overall improvements – on a very confined site.
Bradley Shuffield, Project Manager, OnSite Energy & Power, Burns & McDonnell
Michael Manoucheri, Vice President of Engineering and Maintenance, TECO
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media