45 Rock housed a satellite plant with 30 y/o chillers. Study revealed opportunity to participate in utility demand management program, reducing peak demand at the Center. The plant was replaced with a 2,500 ton chiller plant and a 11,500 ton-hr ice storage plant integrated with a Central CHW loop.
Will Kain, Vanderweil Engineers
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media