Provide details on the chillers and their performances in fixed and variable speed with water-cooled and air-cooled radiator systems. The project started in 1993. The long term plan was to expand Makkah Haram to hold over 1.6 million visitors. In 2009 Yok Titan multi-stage centrifugal chillers were approved.
Amar Farjo, Johnson Controls
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media