Provide details on the chillers and their performances in fixed and variable speed with water-cooled and air-cooled radiator systems. The project started in 1993. The long term plan was to expand Makkah Haram to hold over 1.6 million visitors. In 2009 Yok Titan multi-stage centrifugal chillers were approved.
Amar Farjo, Johnson Controls