Using pre-fabricated Energy Transfer Stations to reduce installation time and cost with optimized design and smart controls to maximise energy eficiency 

10-19-2017 13:47

Summary

Typically substations are field erected, where different components are supplied by various vendors and then field installed according to Piping and Instrument diagrams, Piping Diagrams and Arrangement Drawings. Site questions about component location in relation to others and the detailed information needed to be communicated can lead to delays and mismatched components as well as unexpected performance issues at startup. Pre fabricated substations, where all the components are dimensioned correctly to match the needs of the customer and the manufacturer takes full responsibility for the design and function of the packaged solution will save time, money and avoid unexpected performance issues. This presentation looks at a few case studies to demonstrate the techniques. 

Speaker

Jarmo Rissanen, Alfa Laval Nordic


#2015
#CanadaConference
#ConferenceProceeding
#ConstructionandCommissioning
#AlfalLaval
#Optimization
#ProjectPlanning
#NorthAmerica

Statistics
0 Favorited
8 Views
1 Files
0 Shares
16 Downloads
Attachment(s)
pdf file
Using pre-fabricated Energy Transfer Stations to reduce i...   497 KB   1 version
Uploaded - 10-19-2017
Jarmo Rissanen, Alfa Laval Nordic