Public Content Library

The Art of Replacing Boilers and Chillers in a Central Plant Without Impact to Production Needs 

03-13-2018 16:00

Summary

Resulting from IB MACT 255,000PPH of coal fired steaming capacity was replaced with natural gas boilers. Four 70,000PPH rental boilers were installed for two years while a four-on-four boiler swap was performed. At the same time 4,800 tons of absorption chillers were replaced with 7,500 tons of centrifugal chillers. This presentation discusses how the use of N + 1 charting provided the roadmap to successfully choreographing seasonal moves of thermal assets.


Session Track 3A

Speakers

Jay Ehrfurth, The Boldt Company


#CampusEnergyConference
#ConferenceProceeding
#2018
#TheBoldtCompany
#Optimization
#MasterPlanningandSystemDesign

Statistics
0 Favorited
6 Views
1 Files
0 Shares
3 Downloads
Attachment(s)
pdf file
3A.3_Ehrfurth.pdf   4.92 MB   1 version
Uploaded - 03-13-2018