Search

1 to 2 of 2
Sort by

Library Entry
Centralizing, Upgrading & Optimizing Chilled Water on Existing Campus

Summary Five central chillers serving eight buildings were replaced with six new chillers that operate in parallel or in triple-series with three pipe distribution that was extended to serve 25 additional buildings where 20 local chillers and dozens of DX units were replaced by five distributed...

2D.2_Morehead_Moyer.pdf


Library Entry
Using CHP as Driver for Campus Hot Water Conversion

Summary This presentation will walk the audience through the step-by-step process of assessing the potential for adding CHP to the campus. This will include developing electric, steam and potential hot water loads; technology screening including turbines, engines and fuel cells; optimizing the...

1B.3MOREHEAD_MACMARTIN.pdf