Implementation of the NextGeneration Connecticut program significantly invests in STEM facilities at the Storrs campus. To support this initiative, there is a significant investment in new district energy infrastructure including a Supplemental Utility Plant (SUP) plus package boiler replacements in the Central Utility Plant (CUP) to provide additional power, steam, chilled water and emergency power capabilities on the campus. This presentation will present the reason for change, design overview, and the current status of implementation.
John Turner,Project Executive,Bond Building District Energy
Craig Parker,Consulting Engineer,BVH Integrated Services
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
Join UsMission & VisionMember BenefitsMember Directory
© 2023 International District Energy Association, All Rights Reserved. Site by eConverse Media