Construction Enquirer
Summary
Gateshead’s long-trailed Baltic Quarter regeneration has edged closer to reality after the council struck a pre-development deal with Muse and ECF to drive forward a 1,600-home mixed-use scheme.
Plans also lean heavily on sustainability, with the area already benefiting from a district energy network powered by the UK’s largest urban solar farm and mine water heat, alongside a recently opened 1,000-space car park designed to support large-scale EV charging.
Continue Reading
#News#DistrictEnergy